Due to technical difficulties with the Course Catalogue, students should confirm course availability with Visual Schedule Builder (VSB) and Minerva. In cases where the Course Catalogue differs from these systems, VSB and Minerva should be considered the source of truth.

MIME 424. Underground Mining Methods.

Credits: 3
Offered by: Mining & Materials Engineering (Faculty of Engineering)
Terms offered: Summer 2026
View offerings for Summer 2026 in Visual Schedule Builder.

Description

Fundamentals of underground mining methods; orebody characteristics and host rock; drilling and blasting procedures; general and specialized equipment; mining method selection criteria; cost estimation; calculation of cut-off grade, ore recovery and dilution; mine developments and underground infrastructure: raises, chutes, loading pockets, dump points, raises, and ore bins; mine safety practice.
  • Prerequisite(s): MIME 322, MIME 325, and MIME 333
  • Restriction(s): Not open to students from CEGEP entry or who have taken MPMC 421.
  • (3-3-3)
  • **Monday May 18 is a statutory holiday; therefore the instructor will make up for the class on Friday May 22nd.
  • **Wednesday June 24th is a statutory holiday; therefore the instructor will make up for the class on Friday June 26th.
  • **Wednesday July 1st is a statutory holiday therefore the instructor would like to make up for the class on Friday July 3rd.
  • **Regular schedule of MW is May 20th, May 25th, May 27th, June 1st, June 3rd, June 8th, June 10th, June 15th, June 17th, June 22 & June 29, 2020.
  • **This course will be held on May 22, 24, 27, 29, June 3, 5, 10, 12, 17, 19, 21, 26, 28 & July 3rd.
  • **Although this course follows a MW class schedule, there will be a class on Friday, May 22nd & Friday, June 26th and a final exam on Friday, July 3rd.

Most students use Visual Schedule Builder (VSB) to organize their schedules. VSB helps you plan class schedules, travel time, and more.

Launch Visual Schedule Builder
Back to top

What are you comfortable with?