Due to technical difficulties with the Course Catalogue, students should confirm course availability with Visual Schedule Builder (VSB) and Minerva. In cases where the Course Catalogue differs from these systems, VSB and Minerva should be considered the source of truth.

MIME 513. Mine Planning Optimization Under Uncertainty.

Credits: 3
Offered by: Mining & Materials Engineering (Faculty of Engineering)
Terms offered: Fall 2026
View offerings for Fall 2026 in Visual Schedule Builder.

Description

Strategic mine planning and optimization under uncertain demand and supply. Modern optimization techniques in mine design and production scheduling. Metal supply and orebody modelling. Market forecasting and planning with flexibility. Valuing information. Stochastic mine optimization and applications in open pit and underground metal mines.
  • 3-3-3
  • Prerequisite: Permission of instructor.
  • Restriction: Not open to students who have taken MIME 413.

Most students use Visual Schedule Builder (VSB) to organize their schedules. VSB helps you plan class schedules, travel time, and more.

Launch Visual Schedule Builder
Back to top

What are you comfortable with?